Cost Savings
If you are considering replacing your existing PRV/PRDS system with an NCON Steam Turbine, you can see more information on how to estimate cost savings in ‘Document 1’ below.
If you are considering installing a High-Pressure Boiler with an NCON Steam Turbine to boost your power generation, you can read more information on how to estimate cost savings in ‘Document 2’ below.
Note: The information provided in these documents has been provided by the US Department of Energy and is simplified for the purpose of estimating cost savings by installing Steam Turbine Generators. These documents (January 2012) reference U.S. DOE software tools that have since been retired; their functions now live in the DOE’s free MEASUR tool suite. For more accurate cost savings estimates please contact the team at NCON.